How odd, you used to be at #497 and #732. Now I only see the single listing at #737.
The main thing is that you said in the thread that you want 2 units. The list is created based on this thread. So donāt worry about it. Once the list is updated you should see your name on there twice.
Hey Jason, sorry to bother, I submitted a comment a while back for one of each, but donāt see my name on the list, maybe I did not format the comment correctly for the script?
In either case, I would love two, one of each emitter!
Thank you! I interpreted other comments to mean that the list was auto updated. I eagerly await any and all updates. Thank you FW3A team for all your work, excited to see this come to life!!!
Now youāve said you want a light two different times. You just want a single light, right?
There have been no updates to the main list since Jan 6th. So everyone that has made a request since then will not see their name until the list is updated again.
Just say what you want one time in this thread and thatās all you have to do.
If your not sure when the list was last updated, just click the last name on the list. You will go to the request and see the date and time.
We donāt even know what leds it will have. ToyKeeper has not seen the latest prototype.
Unless Lumintop has already chosen what LEDs to use and bought them and started a production run and maybe ToyKeeper has already handled the latest prototype and is just keeping quiet about it, then I would say weāre still quite a long ways from shipping a final product.
I know lumintop can get the production rolling pretty quick because weāve seen it before, but we really need to get the above mentioned items sorted out first.
If I understand correctly, the springs are nothing special. The light isnāt designed for maximum lumens, itās designed to be well-rounded. Super-low-resistance springs may not be desirable here.
Anyway, I think Neal may have sent production samples out this week, so I can probably give more information soon. And then if the schedule holds, purchasing can probably start shortly after CNY. Then thereās the usual month or so for slow shipping. So a rough ETA for people actually receiving lights is ā¦ maybe March?