Congratulations for your anniversary! Your sales thread is great.
I was always very satisfied with my orders from you. Keep up the good work.
PM send to order a Convoy C8TT heatsink head, S2+ aluminium triple pill, S2+ copper single pill (no lip around pcb ā for 20mm boards), Brass contact rings. Many thanks.
Itās good that you are here with us. I have always been satisfied with your parts. I still have many unused items that I might use someday. Or Iāll sell them.
In the future I would like to see a solid aluminium triple pill for the S21A to keep the flashlight lightweight.
Iām new to this, but very excited to maybe get my hands on a c8tt head, and also to see what new things you might be working on! I would like to order the following items please:
1x Copper spacer for triple Convoy S21A ($5)
2x Convoy C8TT heatsink head (bare with driver ring and o-rings) ā ($12)
I think I have to share some extra information about current situation. Have not done this earlier because there are still no visible progress.
Iāve tried my best to get a ready-for-use small CNC mill (like tormach 770/1100) or used VMC (Haas minimill/Syil X7/ Scyfire VMC) but had find out that things here are even worth than I expected. Country is closing from the inside, amount of imports flowing down for many years, taxes and bureaucracy are raising each year. All this makes new import machines very expensive (like US price multiplied by 2.5-3), same time deficit (and raising costs of everything) donāt allow used machines prices drop as fast as they should (Iāve seen several 15y.o. HAASes that cost more than brand new model in States). I have looked over several hundred thousands listings, and could not choose anything because main options were CNC router or 30+ y.o. heavy mill with punch tape input or 4k ROM.
During this period, I have also made hundreds of phone conversation with people that sell/upgrade/manufacture machinery, but again, I could not expect that thing here are so bad. People just donāt want too learn using someoneās elseās experience. They offered many funny machines (like heavy 2 ton mill with direct driven small nema motors, or bf20 with modern fanuc CNC and servos), but they are not able to find out how one or other thing should be made based on worldwide experience (read-not able even to copy imported technologies).
āIf the mountain wonāt come to Muhammad, Muhammad will come to the mountainā. Iām going to build it myself. This is not right way. Do not repeat it. Just get tormach or used Haas.
Iām renting a small place for this needs. A place owner was not able to remove his machines from this place, so I could not start repairing work. Need to work hard next several weeks to make it suitable for my needs.
Iāve bought few small manual machines by occasion. Just find out that person Iām calling is different from the others (mentioned above). I donāt overestimate my machinist skills and I have no plans in making big customer work using them. Probable they will not pay off themself, but Iām ok with this because they are valuable and they do not losing value (because of some factors mentioned above).
There is just one small thing that can justify why I have not made big progress in 3.5 months. Things are really slow here. I understand that country is not small but since start of this year Iāve met dozen situation (both as sender and reciever) when delivery took more than 1.5 months. Each day I met situations when something that should work doesnāt. Yesterday I could not get some equipment unloaded from the truck because heightbores forklift has broken batteries, runs on AC transformer and not runs when it rains .
I donāt know how long I can accept all this.
Thanks for the update and sorry to hear of your troubles. I hope things start going more smoothly for you and o look forward to what you have to offer in the future. Wishing you the best.
After the room Iām going to occupy was cleaned from all stuff and garbage left by previous owners, Iāve realized that it needs some deep tough repair work (that Iām not good at and was not expected). I needed to place my machines before I could finish all repair work so Iāve got an agreement to place them temporarily in a bigger (but still ugly and dirty) room. It is hard to make space clean when there is still no water on the whole floor.
Still waiting for some more lathe tooling and will probably need to order more various holders (trying to avoid HSS blanks, donāt want to produce abrasive dust in a new place). Machines are not fully workable and have to make some parts to each other, but I hope I will make some parts for BLF needs in few weeks.