Feeler: 16mm copper sinkpads

from what they told me is that it will be in a few months + for them to make them, and to avoid the tooling we would have to spend over 2k on boards

How much was spent on the 20 mm batch?

i bought a few extra for my self and i think it was lil under $1100

Wait, a few months to save approximately $450 is not a bad idea

That’s true but I don’t no what they would sell them for, has to be higher to cover there tooling ? Just a thought lol

Ps: I think it can be done if we get 1-2 suppliers to help out

were the 20mm higher to cover the tooling?

We did not have to pay the tooling for the 20mm because they had them made all ready.

exactly, if we wait then we can buy 16mm sinkpads under the same circumstances after they tool and start producing them

The trend seems to be toward more options in copper stars so unless this is mission critical I would advocate waiting unless there is a major increase in demand to defray the tooling cost. In other words, I’m interested but not enough to throw my wallet off the cliff with the other lemmings. Keep the thread open and maybe post updates on demand vs moq.

Here is how I see it. Between BLF + CPF there is a Waiting Demand for 2-3000 16mm Copper Stars. The first manufacture will sell a lot fast. Sink PAD is waiting for a Sucker to pay for Setup + Tooling costs. Then they will crank out 2-3ooo units + Rake in the Big Bucks. If they wait to long and someone else comes out first they will lose a lot of sales. I say we wait, Time is on our side.

Plan B I think we should look for other Manufactures. I think a BLF Member ? has a Design ready to go. A Ready Design should cut Setup Costs. More than one manufacture will reduce Cost also.

Can anyone find out where led-tech.de gets their copper boards?

what do you mean with that ? there is another kind of board ready for only 3$?

i can grind/file a 20mm star to 16mm in less than 5 minutes. i don’t want to, but can be done. i’ll wait.

No it’s just a thicker board, so if we want a thicker board it will be around $3 each and that is true once we pay for the tools they will make there’s and resell like they did on the 20mm stars

But ill keep this open for interest ect.

i see,i will be interested for 5 pieces but its true the cost for the tools will be huge for plp you want just few of them.

from that quote, it looks like $2.61 per star would cover all charges when buying 690 of them. someone could charge $3 a board and make a cool $270 it looks like

dont know what the e test charge and nre charge is though…

e-test is for over 3000pcs

I read it as 690 pcs, ~$2.25-2.36/pc

oh, i had added the e test and nre charges to the price too.

so at $3 a board, thats a $441+ profit… hint hint to anyone with the overhead to just buy a lot of them up front and resell. i know people will pay $3+s a board for these
edit: i know thats not a huge profit margin for the initial cost, but it would be a fast turn over i bet :money_mouth_face:

I think nre should be included?

I’ll be talking with them more this week so that I can understand how pricing will change for different configurations.

They’ll custom make XR-E. They already make MT-G2 but not on copper.