That was the plan mate but at the moment there are too many variables.
eg.
*Would the customer cover delivery costs or not.
*If customer provides the host to mod, or have a heat sink made for compared to if I already know the dimensions.
*If drawings or specs are included instead of having to measure and design from scratch.
*Time restraints.
*Availability to materials like Copper/Aluminum bar, or if new stock needs to be ordered.
So for the short term, I’m going to consider every job or request individually and prefer that I’m contacted through a PM to discuss a quote rather than have a set price list and end up charging too much or cutting myself short.
Once I develop a fail safe system and stock up on materials etc, it will allow me to operate more efficiently with set prices and accurate times expected for completion.