UPDATE 171024, 06:15 GMT +8:
Hi friends, I'll be out of town from 171028 - 171102. Any orders placed during the time will be processed in 171103. Thank you.
----------------------------------------------------------------------------------
UPDATE 171015, 13:38 GMT +8:
Hi guys, I messed up with the shipping cost for some areas such as USA, Canada, Germany, etc…
I tried to add Express International shipping option due to problem experienced by Gunga in Canada Post Office. But…. I forgot to include the usual USD 5 Economy Shipping option back in place. It’s fixed now.
So, anyone who couldn’t opt for economy shipping can try again. I’ve sent messages to those already placed the order within the last two days just in case you guys want to opt down for lower shipping cost.
Note:
- The Economy International shipping has been very reliable especially to US and Europe. But the tracking number isn’t the best. In most cases you can only get “rough” delayed update status. Usually the update goes like this: Bali – Jakarta – (Transit country) – (Destination country) – (delivered/received/returned by the buyer)
- The Express International shipping has a much better updater and almost twice as fast delivery time.
The only shipment problems so far are:
- Macedonia: 33 days delivery time
- Canada (Gunga): He didn’t get the packet for 2 months. Later found, the packet misplaced in the Canada Post office. He hasn’t give me further confirmation about this.
- Russia: most deliveries arrived close or more than 30 days. I checked and usually the packets were spent rather long days in Russian custom.
If you really want to get detailed status of your stuff, even using the cheaper Economy International shipping, you can try to send email to: sunsetroadpostoffice@yahoo.com(link sends e-mail)
Expect UP to 5 days delay though.
-----------------------------------------------------------------------------------
UPDATE: 170922. 18:02 GMT +8
- All 219C sm503-D240-L2-R9050 stock from 2017-08-27 are actually sm503-D240-L1-R9050. This is a good thing for most applications, but some don't like too low of a voltage for direct driving. The listing updated accordingly.
Quick reference:
- M1: 3,1 - 3,3 V @700mA
- L2: 2,9 - 3,1 V @ 700mA
- L1: 2,7 - 2,9 V @ 700mA
UPDATE 170727. 16:17 GMT +8:
- If you missed 219BT-V1 (sw40 and sw45k) during last night sale, you can still PM me [10 pcs/type/BLF-er]. I will hold them until 170803, beyond this date, I'll throw them back to the sharks in my store.
UPDATE 170726. 21:43 GMT +8:
- Hi all, the sale will start in 170726 at around 00:00 GMT +8, midnight my time (~3 hours from now). HERE
- I will try to work as fast as I can to complete everything tonight.
- Expect delay in the first batch as this time I have to do it myself between my daily activities.
Although I have a total of 600 pcs of 219BT-V1 (sw45k and sw40) and 900 pcs of E21As/219Cs/319As, I will reserve some of the LED just in case there would be any 219B rush like the last time. I think this is the best option to prioritize BLF-ers who have waited for too long and possibly misses this round. The reserved LED will be available only to BLF-ers by sending me PM via BLF. - I will restock the listings later in my website if there's still any left.
- Due to some reasons I don't ship to Middle East and Africa countries, PM me just to make sure.
UPDATE 170725. 16:46 GMT +8:
- Finally after long wait and many unfortunate events, the sale is now open for worldwide.
- The store moved to: https://www.virence.com/shop
- Please ignore all stock counts in this thread (below)
UPDATE 170217. 24:00 GMT +8:
- The sale for USA and EUROPE has ended.
- This sale is still open for Indonesia and SE. Asia area as long as I still have the stuff.
- I'll ship the orders in two separate package to Texas_Ace and Chouster in 2017 Feb 21. Usually it take less than two weeks time to reach USA and slightly longer to Germany.
- Please subscribe to this thread as the next sale will be announced via this thread. Expect more exotic Nichias!
- Clemence
-------------------------------------------------------------------------------------------------------------
UPDATE 170214:
- The last payment collection date for current order list is 2017 February 17, 24:00 GMT +8 [16:00 GMT 0].
- If we don't hear any payment confirmation, we'll offer the tagged items to the next person in waiting list [otherwise specified by PM].
- We don't have much time since I'll ship the orders to Texas_Ace and Chouster by 2017 February 21.
UPDATE 170127:
- Shipping option and payment for South east Asia added, please scroll down and find it in my "South East Asia ORDER LIST"
UPDATE 170124:
- US, Canada, Mexico order via Texas_Ace [post #2]
- Europe, Russia order via Chouster [post #3]
- Indonesia, South East Asia (will have to check first), order via Clemence [post #1/OP]
- Shipping cost decided by each distributors
- Free shipping within Indonesia for order above USD 12
- The rest of the world, please PM me/Texas_Ace/Chouster first
- First batch will ends in 2017 February 17, 24:00 GMT +8.
- First batch payment must be done in 2017 February 17, 24:00 GMT +8
- First batch delivery in 2017 February 20
- All items with same price tag can be mixed to get the discount.
----------------------------------------------------------------------------------------------
To make it easier on us to count and prioritize orders PLEASE post your order requests. That also to avoid bloody flashfights here. First post - first reserved [until payment deadline].
Click on any LED type to get the data sheet
LED Type | CCT | CRI/R9 min. | Voltage | Flux | Price [1 - 10 pcs] | Price [10+ pcs] | Available/STOCK*1 | |
1 | NVSL219B-V1 | SW45K [4500K ANSI BBL] | 9080 | L2 [2,9 - 3,1V] | D220 | USD 4 | USD 3,7 | SOLD OUT |
2 | NVSL219CT | SM273 [2700K 3 steps MacAdams] | 9050 | L2 [2,9 - 3,1V] | D220 | USD 4 | USD 3,7 | 119 |
3 | NVSL219CT | SM303 [3000K 3 steps MacAdams] | 9050 | L1 [2,7 - 2,9V] | D200 | USD 4 | USD 3,7 | 150 |
4 | NVSL219CT | SM353 [3500K 3 steps MacAdams] | 9050 | L1 [2,7 - 2,9V] | D220 | USD 4 | USD 3,7 | 103 |
5 | NVSL219CT | SM403 [4000K 3 steps MacAdams] | 9050 | L1 [2,7 - 2,9V] | D240 | USD 4 | USD 3,7 | SOLD OUT |
6 | NVSW219CT | SM503 [5000K 3 steps MacAdams] | 9050 | L2 [2,9 - 3,1V] | D240 | USD 4 | USD 3,7 | SOLD OUT |
7 | NVWL219CT | SM573 [5700K 3 steps MacAdams] | 9050 | L2 [2,9 - 3,1V] | D240 | USD 4 | USD 3,7 | SOLD OUT |
8 | NVSW319ATE | SM655 [6500K 5 steps MacAdams] | 7000 | L2 [2,9 - 3,1V] | D440F2 | USD 4 | USD 3,7 | 73 |
9 | NVSL319ATE | SM305 [3000K 5 steps MacAdams] | 8000 | L2 [2,9 - 3,1V] | D400F2 | USD 4 | USD 3,7 | 65 |
10 | NVSL319ATE | SM505 [5000K 5 steps MacAdams] | 8000 | L2 [2,9 - 3,1V] | D400F2 | USD 4 | USD 3,7 | 6 |
11 | NV4L144AM | SM453 [4500K 3 steps MacAdams] | 9050 | N.A. | E900 | USD 8 | USD 7,9 | 63 |
12 | NV4W144AM | SM503 [5000K 3 steps MacAdams] | 9050 | N.A. | E900 | USD 8 | USD 7,9 | 80 |
13 | NV4W144AM | SM573 [5700K 3 steps MacAdams] | 9050 | N.A. | E1000 | USD 8 | USD 7,9 | 85 |
14 | VirEnce S3030 CDTP board | USD 9 | USD 8,5 | 20 |
NOTE*1: Updating at around 24:00 GMT +8, daily
PRODUCT PICTURES:
219B
219C
319A
144AM
VirEnce S3030 CDTP board
ADDITIONAL INFORMATION & DISCUSSIONS:
Thread links
- [SALE] High CRI 90+ Nichias (ENDED)
- Nichia 219C D260 9050 90+ CRI Emitter output test [Texas_Ace]
- Fenix E05 2014 - Nichia LED swaps [Clemence]
- New 3535 Hex die LED from Nichia 309/319A [Clemence]
- Nichia 144A series output test [Djozz]
- Nichia NV4L144/W144 AME/ARE CRI spectrum testing [Maukka]
- NEW Nichia emitters NV4(W/L)144A(R/M) [Clemence]
- Direct drive Nichia 219C? [sac_02]
------------------------------------------------------------
Nichia CCT binning and CCT grouping
Ra 9050 means minimum CRI is 90 (typical 93) points, with deep red minimum of 50 points.
Ra 9080 means minimum CRI is 90 (typical 93) points, with deep red minimum of 80 points.
Ra 7000 means minimum CRI is 70 (typical 73) points, with NO deep red minimum (sometimes can be minus).
Etc...
In Nichia case, the 9050 and 9080 already 10-20% more expensive (depends on LED types). For those don’t really familiar with Nichia's binning, Chouster has made a great chart below. He overlayed Nichia and Cree binning to give us a better perspective. Very useful chart for those tint snobs.
LED manufacturers still don’t have full control over the production variations in colour consistency. You can buy for example 5000K LED but ended having 4500K to 5500K variations in a single reel. Or 5000K with pinkish or greenish colour. So they usually use 3, 5, and 7 MacAdams steps to group the LED CCT manufactured. The smaller the number the tighter the CCT adheres to the standardized baselines.
- 3 steps inward is the highly prized LEDs, normally 20-30% more expensive than 5 steps. The choice for single emitter premium light engines (track lights, single emitter flashlights, medical equipment, high end store display lighting, wall wash lights, etc…)
- 5 steps is where most normal production fall into, if they use good control over phosphor mixing technique. This is usually the baseline for LED pricing.
- 7 steps LEDs are the preferred choice for most non colour consistent critical products, because you can always mix and match several CCT to get the average CCTvalue. The price also 20-30% lower compared to 5 steps. For example street lights, photography LED clusters, multi emitters flashlights, etc…
- Beyond 7 steps oval, the products considered to be off the specs too much. Reputable manufacturers usually destroy or recycle them but, some “leaked” or sold as extremely cheap funny coloured LEDs. For example you can find many cool white LED with melon flavours (very greenish white) in Ebay at amazingly ultra low price. But lately, researchers have found greenish cool white is actually very beneficial for grow lights.
Below is the Nichia & Cree binning chart for comparison - by Chouster
--------------------------------------------
EYE CANDY:
Cree XPL HD - Nichia 319A - Nichia 219C - Nichia 144AM
Cree XPL HD - Nichia 319A - Nichia 219C - Nichia 144AM
--------------------------------------------------
SHIPPING:
----------------------------------------------------
I only use Indonesia Post Office / PT. Pos Indonesia for all orders. It's the most cheap reliable available here. ALL orders will be insured with exactly the same value as the order. That will likely be used to calculate custom tax duty in each buyer's country. And I will not lie about it.
Almost all international economy registered shipment to South East Asian Countries up to 250 Gr vary between USD 4 - 9. I can only give you estimate delivery time between 7 - 30 days. But in most cases, they were delivered in less than 2 weeks time.
To give you the most budget friendly service: I will send you the invoice + the marked up shipping cost (if it approx. USD 4, I'll ask you USD 6). Then after I get the receipt, I'll scan it and refund the change. Sorry for the currency hassle, but PT. Pos always charges international shipment in USD, while I have to pay in IDR.
Paid local shipment (for order below USD 12) usually cost no more than USD 4 and delivered in less than 1 week.
-----------------------------------------------------
Indonesia and South East Asia ORDER LIST
NVSL219B-V1 9080
5. s1m888 [PAID] [SHIPPED]
NVSL219CT 9050 SM273
3. biggulp [PAID] [SHIPPED]
6. TWN [PAID] [SHIPPED]
7. s1m888 [PAID] [SHIPPED]
NVSL219CT 9050 SM303
3. biggulp [PAID] [SHIPPED]
4. s1m888 [PAID] [SHIPPED]
NVSL219CT 9050 SM353
2. Steel_1024 [PAID] [SHIPPED]
5. biggulp [PAID] [SHIPPED]
8. Mustsimon [PAID] [SHIPPED]
NVSL219CT 9050 SM403
2. Steel_1024 [PAID] [SHIPPED]
NVSW219CT 9050 SM503
6. Steel_1024 [PAID] [SHIPPED]
11. Mustsimon [PAID] [SHIPPED]
13. biggulp [PAID] [SHIPPED]
19. Kidanxz [PAID] [SHIPPED]
21. YCLo [PAID] [SHIPPED]
NVSW219CT 9050 SM573
4. Mustsimon [PAID] [SHIPPED]
6. biggulp [PAID] [SHIPPED]
16.YCLo [PAID] [SHIPPED]
NVSL319ATE 7000 SM655
2. Steel_1024 [PAID] [SHIPPED]
NVSW319ATE 8000 SM305
NVSW319ATE 8000 SM505
1. Steel_1024 [PAID] [SHIPPED]
3. biggulp [PAID] [SHIPPED]
NVSL144AM SM453
3. Steel_1024 [PAID] [SHIPPED]
NVSW144AM SM503
NVSW144AM SM573
VirEnce S3030 MCPCB
3. Steel_1024 [PAID] [SHIPPED]
---------------------------------------------------------------------
Ok, I will maintain a list of all those in the USA, Canada and Mexico group buy in this post so as to keep things more organized with 3 “separate” GB’s going on with the same products.
I will be receiving the LED’s from Clemence and then re-packaging them and shipping them out to those all over the USA, Canada and Mexico to save on shipping costs.
USA shipping costs are $2.80 for first class mail with tracking number.
Shipping to Canada and Mexico is $2.80 WITHOUT TRACKING or ~$9.50 with tracking best I can figure based on the USPS website, yeah it is silly.
219B 4500 9080CRI:
1 – emarkd – Paid – Shipped
2 – emarkd – Paid – Shipped
3 – emarkd – Paid – Shipped
4 – emarkd – Paid – Shipped
5 – emarkd – Paid – Shipped
6 – emarkd – Paid – Shipped
7 – staticx57 – Paid – Shipped
8 – staticx57 – Paid – Shipped
9 – staticx57 – Paid – Shipped
10 – staticx57 – Paid – Shipped
11 – THE_dAY – Paid – Shipped
12 – THE_dAY – Paid – Shipped
13 – THE_dAY – Paid – Shipped
14 – THE_dAY – Paid – Shipped
15 – THE_dAY – Paid – Shipped
16 – Texas_Ace – Paid – Arrived
17 – Texas_Ace – Paid – Arrived
18 – Texas_Ace – Paid – Arrived
19 – tebeve – Paid – Shipped
20 – tebeve – Paid – Shipped
21 – tebeve – Paid – Shipped
22 – tebeve – Paid – Shipped
23 – tebeve – Paid – Shipped
24 – tebeve – Paid – Shipped
25 – tebeve – Paid – Shipped
26 – tebeve – Paid – Shipped
27 – tebeve – Paid – Shipped
28 – tebeve – Paid – Shipped
29 – tebeve – Paid – Shipped
30 – tebeve – Paid – Shipped
31 – k-wong – Paid – Shipped
32 – k-wong – Paid – Shipped
33 – k-wong – Paid – Shipped
34 – steve42 – Paid – Shipped
35 – steve42 – Paid – Shipped
36 – sac02 – Paid – Shipped
37 – sac02 – Paid – Shipped
38 – sac02 – Paid – Shipped
39 – sac02 – Paid – Shipped
40 – sac02 – Paid – Shipped
41 – sac02 – Paid – Shipped
42 – sac02 – Paid – Shipped
43 – sac02 – Paid – Shipped
44 – Justintoxicated – Paid – Shipped
45 – Texas_Ace – Paid – Arrived
46 – Gunga – Paid – Shipped
47 – Gunga – Paid – Shipped
48 – Gunga – Paid – Shipped
49 – Gunga – Paid – Shipped
50 – Gunga – Paid – Shipped
51 – Gunga – Paid – Shipped
52 – Gunga – Paid – Shipped
53 – Justintoxicated – Paid – Shipped
54 – Justintoxicated – Paid – Shipped
55 – Justintoxicated – Paid – Shipped
56 – Tjohn – Paid – Shipped
57 – Tjohn – Paid – Shipped
58 – Tjohn – Paid – Shipped
59 – Tjohn – Paid – Shipped
60 – Tjohn – Paid – Shipped
61 – Tjohn – Paid – Shipped
62 – Tjohn – Paid – Shipped
63 – Tjohn – Paid – Shipped
64 – Tjohn – Paid – Shipped
65 – Tjohn – Paid – Shipped
66 – KawiBoy1428 – Paid – Shipped
67 – KawiBoy1428 – Paid – Shipped
68 – KawiBoy1428 – Paid – Shipped
69 – KawiBoy1428 – Paid – Shipped
70 – KawiBoy1428 – Paid – Shipped
71 – KawiBoy1428 – Paid – Shipped
72 – KawiBoy1428 – Paid – Shipped
73 – Texas_Ace – Paid – Arrived
74 – Texas_Ace – Paid – Arrived
75 – Texas_Ace – Paid – Arrived
76 – Texas_Ace – Paid – Arrived
77 – Texas_Ace – Paid – Arrived
78 – Texas_Ace – Paid – Arrived
79 – Texas_Ace – Paid – Arrived
80 – Texas_Ace – Paid – Arrived
81 – Texas_Ace – Paid – Arrived
82 – ZFL-M60 – Paid – Shipped
83 – ZFL-M60 – Paid – Shipped
84 – ZFL-M60 – Paid – Shipped
85 – Texas_Ace – Paid – Arrived
86 – Texas_Ace – Paid – Arrived
87 – Texas_Ace – Paid – Arrived
88 – Texas_Ace – Paid – Arrived
SOLD OUT!
219C 2700k:
1 – sac02 – Paid – Shipped
2 – sac02 – Paid – Shipped
3 – Justintoxicated – Paid – Shipped
4 – Justintoxicated – Paid – Shipped
5 – Justintoxicated – Paid – Shipped
6 – Justintoxicated – Paid – Shipped
7 – FrontPorchCarver – Paid – Shipped
8 – FrontPorchCarver – Paid – Shipped
9 – FrontPorchCarver – Paid – Shipped
10 – FrontPorchCarver – Paid – Shipped
11 – FrontPorchCarver – Paid – Shipped
12 – k-wong – Paid – Shipped
13 – k-wong – Paid – Shipped
14 – k-wong – Paid – Shipped
15 – k-wong – Paid – Shipped
16 – PrinceValorum – Paid – Shipped
17 – PrinceValorum – Paid – Shipped
18 – davidkappelt – Paid – Shipped
19 – davidkappelt – Paid – Shipped
20 – davidkappelt – Paid – Shipped
21 – Lyyyyghtey – Paid – Shipped
22 – Lyyyyghtey – Paid – Shipped
23 – Lyyyyghtey – Paid – Shipped
24 – Lyyyyghtey – Paid – Shipped
25 – Lyyyyghtey – Paid – Shipped
26 – Lyyyyghtey – Paid – Shipped
27 – Texas_Ace – Paid – Arrived
28 – Texas_Ace – Paid – Arrived
29 – Texas_Ace – Paid – Arrived
219C 3000k:
1 – sac02 – Paid – Shipped
2 – sac02 – Paid – Shipped
3 – FrontPorchCarver – Paid – Shipped
4 – FrontPorchCarver – Paid – Shipped
5 – FrontPorchCarver – Paid – Shipped
6 – FrontPorchCarver – Paid – Shipped
7 – FrontPorchCarver – Paid – Shipped
8 – illuminos – Paid – Shipped
9 – illuminos – Paid – Shipped
10 – illuminos – Paid – Shipped
11 – illuminos – Paid – Shipped
12 – illuminos – Paid – Shipped
13 – illuminos – Paid – Shipped
14 – Gunga – Paid – Shipped
15 – Phosphor22 – Paid – Shipped
16 – Phosphor22 – Paid – Shipped
17 – Phosphor22 – Paid – Shipped
18 – PrinceValorum – Paid – Shipped
19 – PrinceValorum – Paid – Shipped
20 – Caleb – Paid – Shipped
21 – Caleb – Paid – Shipped
22 – Caleb – Paid – Shipped
23 – steve42 – Paid – Shipped
24 – steve42 – Paid – Shipped
219C 3500k:
1 – Gunga – Paid – Shipped
2 – Gunga – Paid – Shipped
3 – Gunga – Paid – Shipped
4 – Gunga – Paid – Shipped
5 – Gunga – Paid – Shipped
6 – Gunga – Paid – Shipped
7 – Justintoxicated – Paid – Shipped
8 – Justintoxicated – Paid – Shipped
9 – Justintoxicated – Paid – Shipped
10 – Justintoxicated – Paid – Shipped
11 – staticx57 – Paid – Shipped
12 – staticx57 – Paid – Shipped
13 – staticx57 – Paid – Shipped
14 – staticx57 – Paid – Shipped
15 – Tjohn – Paid – Shipped
16 – Tjohn – Paid – Shipped
17 – Tjohn – Paid – Shipped
18 – emarkd – Paid – Shipped
19 – emarkd – Paid – Shipped
20 – emarkd – Paid – Shipped
21 – Phosphor22 – Paid – Shipped
22 – Phosphor22 – Paid – Shipped
23 – Phosphor22 – Paid – Shipped
24 – Phosphor22 – Paid – Shipped
25 – PrinceValorum – Paid – Shipped
26 – PrinceValorum – Paid – Shipped
27 – steve42 – Paid – Shipped
28 – steve42 – Paid – Shipped
29 – Lyyyyghtey – Paid – Shipped
30 – Lyyyyghtey – Paid – Shipped
31 – mattlward – Paid – Shipped
32 – mattlward – Paid – Shipped
33 – Texas_Ace – Paid – Arrived
219C 4000k:
1 – emarkd – Paid – Shipped
2 – emarkd – Paid – Shipped
3 – emarkd – Paid – Shipped
4 – emarkd – Paid – Shipped
5 – emarkd – Paid – Shipped
6 – emarkd – Paid – Shipped
7 – tebeve – Paid – Shipped
8 – tebeve – Paid – Shipped
9 – tebeve – Paid – Shipped
10 – tebeve – Paid – Shipped
11 – tebeve – Paid – Shipped
12 – tebeve – Paid – Shipped
13 – tebeve – Paid – Shipped
14 – tebeve – Paid – Shipped
15 – tebeve – Paid – Shipped
16 – tebeve – Paid – Shipped
17 – tebeve – Paid – Shipped
18 – tebeve – Paid – Shipped
19 – sac02 – Paid – Shipped
20 – sac02 – Paid – Shipped
21 – sac02 – Paid – Shipped
22 – sac02 – Paid – Shipped
23 – Gunga – Paid – Shipped
24 – Gunga – Paid – Shipped
25 – Gunga – Paid – Shipped
26 – Gunga – Paid – Shipped
27 – Gunga – Paid – Shipped
28 – KawiBoy1428 – Paid – Shipped
29 – KawiBoy1428 – Paid – Shipped
30 – KawiBoy1428 – Paid – Shipped
31 – KawiBoy1428 – Paid – Shipped
32 – KawiBoy1428 – Paid – Shipped
33 – KawiBoy1428 – Paid – Shipped
34 – KawiBoy1428 – Paid – Shipped
35 – Tjohn – Paid – Shipped
36 – Tjohn – Paid – Shipped
37 – Tjohn – Paid – Shipped
38 – Caleb – Paid – Shipped
39 – Caleb – Paid – Shipped
40 – Caleb – Paid – Shipped
41 – Caleb – Paid – Shipped
42 – Caleb – Paid – Shipped
43 – Gunga – Paid – Shipped
44 – sac02 – Paid – Shipped
45 – sac02 – Paid – Shipped
46 – FrontPorchCarver – Paid – Shipped
47 – FrontPorchCarver – Paid – Shipped
48 – FrontPorchCarver – Paid – Shipped
49 – FrontPorchCarver – Paid – Shipped
50 – FrontPorchCarver – Paid – Shipped
51 – k-wong – Paid – Shipped
52 – k-wong – Paid – Shipped
53 – steve42 – Paid – Shipped
54 – steve42 – Paid – Shipped
SOLD OUT
219C 5000k:
1 – emarkd – Paid – Shipped
2 – emarkd – Paid – Shipped
3 – emarkd – Paid – Shipped
4 – emarkd – Paid – Shipped
5 – emarkd – Paid – Shipped
6 – emarkd – Paid – Shipped
7 – emarkd – Paid – Shipped
8 – emarkd – Paid – Shipped
9 – emarkd – Paid – Shipped
10 – emarkd – Paid – Shipped
11 – vinte77 – Paid – Shipped
12 – vinte77 – Paid – Shipped
13 – vinte77 – Paid – Shipped
14 – vinte77 – Paid – Shipped
15 – tebeve – Paid – Shipped
16 – tebeve – Paid – Shipped
17 – tebeve – Paid – Shipped
18 – tebeve – Paid – Shipped
19 – tebeve – Paid – Shipped
20 – tebeve – Paid – Shipped
21 – tebeve – Paid – Shipped
22 – tebeve – Paid – Shipped
23 – tebeve – Paid – Shipped
24 – tebeve – Paid – Shipped
25 – tebeve – Paid – Shipped
26 – tebeve – Paid – Shipped
27 – sac02 – Paid – Shipped
28 – sac02 – Paid – Shipped
29 – KawiBoy1428 – Paid – Shipped
30 – KawiBoy1428 – Paid – Shipped
31 – KawiBoy1428 – Paid – Shipped
32 – KawiBoy1428 – Paid – Shipped
33 – KawiBoy1428 – Paid – Shipped
34 – KawiBoy1428 – Paid – Shipped
35 – KawiBoy1428 – Paid – Shipped
36 – Texas_Ace – Paid – Arrived
37 – Texas_Ace – Paid – Arrived
38 – Texas_Ace – Paid – Arrived
39 – Texas_Ace – Paid – Arrived
40 – Texas_Ace – Paid – Arrived
41 – Texas_Ace – Paid – Arrived
42 – Texas_Ace – Paid – Arrived
43 – Texas_Ace – Paid – Arrived
44 – Texas_Ace – Paid – Arrived
45 – Texas_Ace – Paid – Arrived
46 – Texas_Ace – Paid – Arrived
47 – Texas_Ace – Paid – Arrived
48 – Texas_Ace – Paid – Arrived
49 – Texas_Ace – Paid – Arrived
50 – Texas_Ace – Paid – Arrived
51 – will34 – Paid – Shipped
52 – will34 – Paid – Shipped
53 – RobertB – Paid – Shipped
54 – RobertB – Paid – Shipped
55 – RobertB – Paid – Shipped
56 – RobertB – Paid – Shipped
57 – RobertB – Paid – Shipped
58 – RobertB – Paid – Shipped
59 – steve42 – Paid – Shipped
60 – steve42 – Paid – Shipped
61 – Speed4goal – Paid – Shipped
62 – Speed4goal – Paid – Shipped
63 – Caleb – Paid – Shipped
64 – Caleb – Paid – Shipped
65 – Caleb – Paid – Shipped
66 – Caleb – Paid – Shipped
67 – Caleb – Paid – Shipped
68 – Caleb – Paid – Shipped
69 – Caleb – Paid – Shipped
70 – illuminos – Paid – Shipped
71 – illuminos – Paid – Shipped
72 – illuminos – Paid – Shipped
73 – illuminos – Paid – Shipped
74 – illuminos – Paid – Shipped
75 – illuminos – Paid – Shipped
76 – illuminos – Paid – Shipped
77 – illuminos – Paid – Shipped
78 – illuminos – Paid – Shipped
79 – illuminos – Paid – Shipped
80 – Texas_Ace – Paid – Arrived
81 – Texas_Ace – Paid – Arrived
82 – Texas_Ace – Paid – Arrived
83 – Texas_Ace – Paid – Arrived
84 – Texas_Ace – Paid – Arrived
85 – Texas_Ace – Paid – Arrived
86 – Texas_Ace – Paid – Arrived
87 – Texas_Ace – Paid – Arrived
88 – Texas_Ace – Paid – Arrived
89 – Texas_Ace – Paid – Arrived
90 – Texas_Ace – Paid – Arrived
91 – Gunga – Paid – Shipped
92 – Gunga – Paid – Shipped
93 – Gunga – Paid – Shipped
94 – davidkappelt – Paid – Shipped
95 – gchart – Paid – Shipped
96 – gchart – Paid – Shipped
97 – steve42 – Paid – Shipped
98 – steve42 – Paid – Shipped
219C 5700k:
1 – will34 – Paid – Shipped
2 – will34 – Paid – Shipped
3 – will34 – Paid – Shipped
4 – staticx57 – Paid – Shipped
5 – staticx57 – Paid – Shipped
6 – staticx57 – Paid – Shipped
7 – staticx57 – Paid – Shipped
8 – FrontPorchCarver – Paid – Shipped
9 – FrontPorchCarver – Paid – Shipped
10 – FrontPorchCarver – Paid – Shipped
11 – FrontPorchCarver – Paid – Shipped
12 – FrontPorchCarver – Paid – Shipped
13 – k-wong – Paid – Shipped
14 – Caleb – Paid – Shipped
15 – Caleb – Paid – Shipped
16 – Caleb – Paid – Shipped
319A 3000k:
1 – scianiac – Paid – Shipped
2 – scianiac – Paid – Shipped
3 – scianiac – Paid – Shipped
4 – Gunga – Paid – Shipped
5 – sac02 – Paid – Shipped
6 – emarkd – Paid – Shipped
7 – emarkd – Paid – Shipped
8 – emarkd – Paid – Shipped
9 – Texas_Ace – Paid – Arrived
10 – Texas_Ace – Paid – Arrived
11 – Texas_Ace – Paid – Arrived
12 – Texas_Ace – Paid – Arrived
13 – sac02 – Paid – Shipped
14 – PrinceValorum – Paid – Shipped
15 – PrinceValorum – Paid – Shipped
16 – Justintoxicated – Paid – Shipped
17 – Justintoxicated – Paid – Shipped
18 – Justintoxicated – Paid – Shipped
19 – Justintoxicated – Paid – Shipped
20 – davidkappelt – Paid – Shipped
21 – davidkappelt – Paid – Shipped
22 – davidkappelt – Paid – Shipped
319A 5000k:
1 – emarkd – Paid – Shipped
2 – emarkd – Paid – Shipped
3 – emarkd – Paid – Shipped
4 – emarkd – Paid – Shipped
5 – emarkd – Paid – Shipped
6 – emarkd – Paid – Shipped
7 – sac02 – Paid – Shipped
8 – sac02 – Paid – Shipped
9 – Texas_Ace – Paid – Arrived
10 – Texas_Ace – Paid – Arrived
11 – Texas_Ace – Paid – Arrived
12 – Texas_Ace – Paid – Arrived
13 – Texas_Ace – Paid – Arrived
14 – Texas_Ace – Paid – Arrived
15 – Texas_Ace – Paid – Arrived
16 – Texas_Ace – Paid – Arrived
17 – Texas_Ace – Paid – Arrived
18 – Texas_Ace – Paid – Arrived
19 – Texas_Ace – Paid – Arrived
20 – Texas_Ace – Paid – Arrived
21 – Texas_Ace – Paid – Arrived
22 – Texas_Ace – Paid – Arrived
23 – Texas_Ace – Paid – Arrived
24 – Texas_Ace – Paid – Arrived
25 – Texas_Ace – Paid – Arrived
26 – Texas_Ace – Paid – Arrived
27 – Texas_Ace – Paid – Arrived
28 – Texas_Ace – Paid – Arrived
29 – Justintoxicated – Paid – Shipped
30 – Justintoxicated – Paid – Shipped
31 – Justintoxicated – Paid – Shipped
32 – Justintoxicated – Paid – Shipped
33 – sac02 – Paid – Shipped
34 – sac02 – Paid – Shipped
35 – scianiac – Paid – Shipped
36 – scianiac – Paid – Shipped
37 – scianiac – Paid – Shipped
38 – scianiac – Paid – Shipped
39 – scianiac – Paid – Shipped
40 – scianiac – Paid – Shipped
41 – westcoastwonders – Paid – Shipped
42 – westcoastwonders – Paid – Shipped
43 – westcoastwonders – Paid – Shipped
44 – westcoastwonders – Paid – Shipped
45 – Gunga – Paid – Shipped
46 – Gunga – Paid – Shipped
47 – Texas_Ace – Paid – Arrived
48 – gchart – Paid – Shipped
49 – davidkappelt – Paid – Shipped
50 – Lyyyyghtey – Paid – Shipped
51 – Lyyyyghtey – Paid – Shipped
52 – gchart – Paid – Shipped
319A 6500k:
1 – scianiac – Paid – Shipped
2 – scianiac – Paid – Shipped
3 – scianiac – Paid – Shipped
Texas Avenger Driver Series
My LED Test series - XP-L2 V5 - Nichia 219C 90+ CRI - Latticebright "XM-L" - XHP35 & PWM efficiency - XHP50 - XP-L V5 - XM-L2 U2 - XP-G3 S5 - XP-L HI V2 - Oslon Square & direct comparison to Djozz tests - Nichia 319A - Nichia 219B 9080 CRI - Nichia 219C D320 - Nichia 229AT - XHP70.2 P2 - XHP50.2 J4 - Samsung LH351D
Easy comparison tool for all my LED tests
I’ll do the same thing for europe.
I checked for quotes and pricing of packaging stuff. I think I’ll go with four different options.back-up link
Will you be the EU packer/shipper ?
"-X3-, is there any place in your house without a flashlight ?"
My Flashlight public album (mods, emitter swaps, eye candy)
My reviews channel (French language, Olight, Thorfire, Sofirn, Lumintop : 60+ lights tested)
My personal channel (including Olight SR mini, S1, S2, S1A and S-mini disassembly)
M4DM4X blog, saves you $$$
Yes he will
www.virence.com
Physical and thermal properties of solder alloy - Shooting Beamshots With HDR - Nichia E21A Tint Shots
Its Okay To Be Smart - SmarterEveryDay - Deep Look - Veritasium - Tech Ingredients
Count me in too!
Words can be broken,
so can bones.
Count me in too!
Words can be broken,
so can bones.
Subscribed!
Subscribed as well…
Also subscribed…
Subscribed
IN!
KB1428 “Live Life WOT”
OK, I’ll take
10 219b sw45k r9080 (if there’s enough to go around)
6 219c sw403
10 219c sw503
Also what’s a 319a? I musta missed something, but I think I want some of those 4500k 319as too, put me down for 6 for now.
I’ll take 5 219B SW45 R9080
Thanks!
I’ll take please:
10x NVSL219B-V1 SW45K [4500K] (or up to the limit, if you decide to limit quantity)
2x NVSL219CT SM303 [3000K]
2x NVSL219CT SM353 [3500K]
18x NVSL219CT SM403 [4000K]
6x NVSW219CT SM503 [5000K]
1x NVWL219CT SM573 [5700K]
1x NV4W144AM SM503 [5000K], if available together with VirEnce 30mmx30mm CDTP board
Thanks a lot!
TA,
I’ll take:
NVSL219B-V1 SW45K x 3
NVSW219CT SM503 x 4
Thanks!
Okay, I’m in for:
(12) – 219b r9080 (but like emarkd said, if there’s enough to go around)
(12) – 219c SM403 – 4000K
(12) – 219c SM503 – 5000K
please and thank you!
I’ll take 5x NVSL219B-V1 SW45K [4500K]
in for 5pcs NVSL219B-V1 SW45K [4500K ANSI BBL] 9080 L2 [2,9 – 3,1V] D220 USD 4 USD 3,7
In case the picture is not visible:
Line1: qty10
Line2: qty2
Line3: qty2
Line5: qty4
Line6: qty2
Line10: qty2
Not anxious, just curious:
What is the estimated time frame for payment and shipping?
Could these leds get ordered on mcpcbs? If so, in for a few
Sign me up for 4× 219B V1 SW45K
Maybe more later.
I’ll take
10× 219B r9080 or whatever the limit is.
6× 219C sm353
5× 219C sm403
Jay, can I have some?
8 pieces of no. 1 219B V1 SW45K R9080
)
1 piece of no. 8. 319A SM655 70CRI (for testing
3 pieces of no. 9. 319A SM305 80CRI
4 pieces of no. 10. 319A SM453 (5?) 80CRI
A few remarks: I guess no. 4 is SM455? And I think that D220 is a very good bin for led no. 1 !
link to djozz tests
Indeed, Nichia hated me for insisting on that bin
Yes, corrected to sm455. It’s sm505. Thanks Joswww.virence.com
Physical and thermal properties of solder alloy - Shooting Beamshots With HDR - Nichia E21A Tint Shots
Its Okay To Be Smart - SmarterEveryDay - Deep Look - Veritasium - Tech Ingredients
Hello,
Long time lurker, first time poster. I would also be interested for a first DIY project. Would that be OK or is there a specific prerequisite?
NVSL219B-V1 SW45K [4500K ANSI BBL] - 6 pcs
NVSL219CT SM273 [2700K 3 steps MacAdams] – 6 pcs
/Dave
Kindly include me for:
10 pieces of – 219B V1 SW45K R9080 (The first line of the list)
*And also include my ‘Thank You’ for the time and effort involved in providing this service.
I would like….
7pcs. line 1 – 219B V1 SW45K R90807pcs. line 6 – 219CT SM503
7pcs. line 5 SM403 (EDIT)
please, and thanks for doing this!
KB1428 “Live Life WOT”
5× 219B-V1 SW45 R9080
15× 219C SW50 R9050
How many 219Bs with R9080 did you get?
Project Excalibur - Next Generation LED Thrower (UPDATE 2018-01-15: 1.7Mcd)
Portable Thrower Comparison
UPDATE 170124:
www.virence.com
Physical and thermal properties of solder alloy - Shooting Beamshots With HDR - Nichia E21A Tint Shots
Its Okay To Be Smart - SmarterEveryDay - Deep Look - Veritasium - Tech Ingredients
Got you added.
The 319A is the latest and greatest from nichia, I have high hopes for it but it is not tested yet. I plan to fix then as soon as my order comes in.
Added
Added as well
Added
Got you are well
This GB will run till around the 17th of February. Shipping will be the following week to us distributors and then from us to ya’ll as soon as we get them.
On the list
You get the idea by now I think lol
Same for you.
Texas Avenger Driver Series
My LED Test series - XP-L2 V5 - Nichia 219C 90+ CRI - Latticebright "XM-L" - XHP35 & PWM efficiency - XHP50 - XP-L V5 - XM-L2 U2 - XP-G3 S5 - XP-L HI V2 - Oslon Square & direct comparison to Djozz tests - Nichia 319A - Nichia 219B 9080 CRI - Nichia 219C D320 - Nichia 229AT - XHP70.2 P2 - XHP50.2 J4 - Samsung LH351D
Easy comparison tool for all my LED tests
Pages