Xenovora
(Xenovora)
29
Contracted to get replacement cells? Like a pre-order type thing? Does this save a lot of money for some reason? How does that work as opposed to simply buying 16 more when needed?
Yes, there will certainly be hands-on training with 2-4 individuals who will be charging the batteries and a cheat sheet guide.
Also, these batteries will be charged in this way:
The charger will be connected to a master power switch which is used for 2 hours M/T/W/T. During those 2 hour periods on those 4 days, the back up 8 cells will be remain in their charger, but the power will be turned cut by the main switch after the 2 hours. The cells won’t ever be getting a full 6+ hour charge, but 2 hours at a time. If it doesn’t reach max, it’ll do it the next day. The charger has over-charge protection.
During each of those days, the other 8 cells will be used in the lights, 10-15 mins/day on Turbo. Every Thursday, the 4th day, myself or another individual will swap the batteries from the lights, with the 8 fully charged cells (over 4 days) and put the drained cells into the charger to be charged the following Monday 2hrs each day as the main power is turned on.