*BLF LT1 Lantern Project) (updated Nov,17,2020)

Both the English and German manual are now finished and ready to print. You can download it from the sharepoint. This will be the revision (10/04/2019) that Sofirn should be using as of batch #2. It will be forwarded to Sofirn by Monday next week, i.e. right after CND celebration has ended. Now, it should be as good as it gets.

Update October 5, 2019: Some significant changes and additions have come up (see following posts) that made it necessary to revise the manual once more. I have highlighted those changes in the pictures below. Now, I really hope everything is ready for printing. The final version has the time stamp "2019/05/10".