Kiriba-Ru
I have placed a few orders with you and it has always been a great experience. Thank you for offering these parts and for your excellent service. I wish you the very best and look forward to new parts. I’ll take the M2 quad spacer and two U11 spacers from this list (If that is ok and I’d be happy to pay you some for U11 spacers, especially since I would be getting two), then I’d like to add 2 s21a spacers.
I’m hoping to see the maglite heatsinks come back and maybe a C8 6x spacer like Led4Power used to sell.
Last batch was produced two years ago. Only now they are sold out.
I used to get full rod (3m=10ft) of copper and run cnc batch that used most of this rod.
Today is not best time for another batch. Not only because Im trying to save some funds.
Raw copper prices have grown almost twice last year:
Congratulations for your anniversary! Your sales thread is great.
I was always very satisfied with my orders from you. Keep up the good work.
PM send to order a Convoy C8TT heatsink head, S2+ aluminium triple pill, S2+ copper single pill (no lip around pcb – for 20mm boards), Brass contact rings. Many thanks.
It’s good that you are here with us. I have always been satisfied with your parts. I still have many unused items that I might use someday. Or I’ll sell them.
In the future I would like to see a solid aluminium triple pill for the S21A to keep the flashlight lightweight.
I’m new to this, but very excited to maybe get my hands on a c8tt head, and also to see what new things you might be working on! I would like to order the following items please:
1x Copper spacer for triple Convoy S21A ($5)
2x Convoy C8TT heatsink head (bare with driver ring and o-rings) – ($12)
I think I have to share some extra information about current situation. Have not done this earlier because there are still no visible progress.
I’ve tried my best to get a ready-for-use small CNC mill (like tormach 770/1100) or used VMC (Haas minimill/Syil X7/ Scyfire VMC) but had find out that things here are even worth than I expected. Country is closing from the inside, amount of imports flowing down for many years, taxes and bureaucracy are raising each year. All this makes new import machines very expensive (like US price multiplied by 2.5-3), same time deficit (and raising costs of everything) don’t allow used machines prices drop as fast as they should (I’ve seen several 15y.o. HAASes that cost more than brand new model in States). I have looked over several hundred thousands listings, and could not choose anything because main options were CNC router or 30+ y.o. heavy mill with punch tape input or 4k ROM.
During this period, I have also made hundreds of phone conversation with people that sell/upgrade/manufacture machinery, but again, I could not expect that thing here are so bad. People just don’t want too learn using someone’s else’s experience. They offered many funny machines (like heavy 2 ton mill with direct driven small nema motors, or bf20 with modern fanuc CNC and servos), but they are not able to find out how one or other thing should be made based on worldwide experience (read-not able even to copy imported technologies).
“If the mountain won’t come to Muhammad, Muhammad will come to the mountain”. I’m going to build it myself. This is not right way. Do not repeat it. Just get tormach or used Haas.
I’m renting a small place for this needs. A place owner was not able to remove his machines from this place, so I could not start repairing work. Need to work hard next several weeks to make it suitable for my needs.
I’ve bought few small manual machines by occasion. Just find out that person I’m calling is different from the others (mentioned above). I don’t overestimate my machinist skills and I have no plans in making big customer work using them. Probable they will not pay off themself, but I’m ok with this because they are valuable and they do not losing value (because of some factors mentioned above).
There is just one small thing that can justify why I have not made big progress in 3.5 months. Things are really slow here. I understand that country is not small but since start of this year I’ve met dozen situation (both as sender and reciever) when delivery took more than 1.5 months. Each day I met situations when something that should work doesn’t. Yesterday I could not get some equipment unloaded from the truck because heightbores forklift has broken batteries, runs on AC transformer and not runs when it rains .
I don’t know how long I can accept all this.
Thanks for the update and sorry to hear of your troubles. I hope things start going more smoothly for you and o look forward to what you have to offer in the future. Wishing you the best.