Gyrfalcon all 88 new version behind schedule?

I spoke with enova quite some time ago regarding the all 88. This was back when there were a couple left in stock and they told me a new version was to be released soon, I think they told me in July of 2024. I’ve waited patiently for them to be restocked and no luck. Enova didn’t respond when I emailed them a few weeks ago. I’m wondering if anyone has heard anything about this.

Here is the email I received 4/29/2024

Hi Chris,

All88 is currently being upgraded based on our latest hardware design, offering more features beloved by enthusiasts (such as customizable termination voltage, charging functionality for 1.5V lithium batteries, etc.). The new All88 will be launched and available for sale in July.

By the way, Enova gyrfalcon newest S8000 and S4000 Pro 4 slots battery charger & analyzer have been released.
1 It is suitable for Ni-Mh, Ni-Cd, LifePo4, Liion4.20, Liion4.30, Liion4.35 batteries.
2 It can charge 21700 button tops batteries and 426650 batteries.
3 It can charge 4x2A(S8000),4x1A(S4000 Pro) at the same time, or discharge 4
1A at the same time. The efficient of charging rate is very high, and the internal heating is very low during charging period.
4 The measurement function on current, voltage and batteries capacity is accurate and real-time as hobbyist expected.
5 The current could be setting below 2A and voltage could be setting below 5V as hobbyist expected.
6 Two UI modes, NORMAL and PROFESSIONAL, both professional mode and normal mode can be conveniently programmed through QUICK operation, COPY operations, and RESET DEFAULT PROGRAMS operation. In normal mode, the 0-9 programs set in the professional mode can be accessed.
7 Six working modes: charge, discharge, cycle, refresh, break-in and storage.
8 The unique design on software and hardware leads to highly accurate control, and the curve of charging and discharging are perfect.
9 Eight touch buttons, the real-time and sensitivity of touch buttons is close to physical buttons.
10 Two unit 3010 fluid bearing fans with low noise reduce the temperature while discharging.
11 The discharging is linear current, stable and accurate.
12 Firmware updating is possible, but it is only tested on the Windows now

Best regards,
The Enova Team